Wednesday, May 18, 2011

Updated Status Photos, Fireplace/TV built-in and bar area cabinets are finished!

The basement cabinets are done!  The bar area and the TV/fireplace built-in sections are completed and will be delivered on Friday or Monday.  The sheetrockers are continuing to work on finishing the walls.  They talked me into doing knock-down finish on the ceiling.  I needed to pick out the maple door style.  Here is a picture of the door style that I picked out.
I picked out stain color 3219.  It is a medium colored stain.  Here are some more photos from the basement.
This picture is in the basement bedroom with the new window (it needed to be bigger than the original window for code purposes.  Here are some more views of the new Marvin Integrity Window

Here are a few views of the family room/bar area of the basement:




And here is the bathroom without the fixtures.  You can see the shower at the back of the bathroom.

I also wanted to post some updated pictures of the kitchen cupboards.  Adam, from Lakeside Cabinets, figured out a cool way for me to include an appliance garage in the kitchen.  Look at these cool views of that corner of the kitchen.  The kitchen cabinets should be done by next week sometime.  You can also see where the drawer style microwave and built-in ovens will be located in the open spots. 


I will be picking out faucets, sinks, tile, carpet, paint color, light fixtures, and gas fireplace inserts this week. 

1 comment:

  1. It is coming together nicely, what color countertops are you getting?

    ReplyDelete